Floor plan to be provided by the producer
- 97.4 m²
- Usable floor area
- 11
- rooms
- 4
- bathrooms
House layout
Usable floor area
rooms
bathrooms
| Room | Area |
|---|---|
| Bedroom 1 | 13.29 m² |
| Bedroom 2 | 10.39 m² |
| Bathroom 1 | 2.67 m² |
| Bathroom 2 | 1.79 m² |
| Hallway 1 | 6.61 m² |
| Bedroom 3 | 9.32 m² |
| Bathroom 3 | 5.76 m² |
| Bathroom 4 | 4.12 m² |
| Hallway 2 | 4.84 m² |
| Living room | 21.85 m² |
| Kitchen | 16.71 m² |
Price and scope
Welded steel frame structure
Kitchen furniture, worktops, including installation
Building envelope insulation - PUR foam
Bathroom finishing - waterproofing (liquid membrane), tiles, sanitary fittings, fixture fitting
Installation of interior doors
Roof covering - standing seam metal sheet
Hidden gutter system
Air-to-water heat pump
Facade: gable walls - HPL facade panels
Air conditioning
| Line item | Developer finishfrom €243 900 |
|---|---|
| Welded steel frame structure | Included |
| Kitchen furniture, worktops, including installation | Option |
| Building envelope insulation - PUR foam | Included |
| Bathroom finishing - waterproofing (liquid membrane), tiles, sanitary fittings, fixture fitting | Option |
| Installation of interior doors | Option |
| Roof covering - standing seam metal sheet | Included |
| Hidden gutter system | Included |
| Air-to-water heat pump | Option |
| Facade: gable walls - HPL facade panels | Included |
| Air conditioning | Option |
Plot and delivery
Foundation
Formalities
Technology and construction
Construction and finish
What is the house built from?
Welded steel frame structure (factory modules)
What's the roof pitch?
Gable, standing seam metal roofing
How tight are the windows and doors?
To be decided while setting up the project
The energy class of the windows and doors will be chosen together with the manufacturer, based on your needs and budget.
What is the ventilation system?
This project has gravity-based ventilation.
Air exchanges through vents and pressure differences — worth opening windows too in summer.
What heats the house?
The house is heated electrically.
Heat comes directly from electricity — simple to install, running cost depends on the electricity price.
Completed projects and producer

18 models on offer
In-person visits to be determined with the producer
Completed builds of this project
Real photos of completed houses from this project, to be provided by the producer